top of page

Going with the Main Halyard through a rope clutch.

After feeding the screacher halyard through the mast, I did end up making replacing it in the masts built in block and cleat, pulling out the main halyard to now run through two deck blocks to guide it back through a double rope clutch that I drilled and epoxied the holes for last night.

Hopefully this will make handling the main a bit easier.

The cabin companionway hatch lock is installed,


Featured Posts
Check back soon
Once posts are published, you’ll see them here.
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page