top of page

Latest News 4/23/2017:

Our Farrier F22 is nearly ready for its first sea trail.  With long hours put in by Sarah and Bryan, it is almost there.

The electrical system is nearly ready.  The Mast Raising System V1.0 is complete, forward hatch installed, progress is clearly being made.

On mast raising:

The gin pole is a little long, and the system needed some fine tuning but I feel it can be done nearly solo.  A few parts here and there it is clearly nice to have a second person. 

On having Sarah as my better half:

 She is right there with me every step of the way, even putting in extra hours Saturday night trying out the electrical system.  It's her design, a bit complicated for me, but in the end she is definitely doing it right.  I am truly impressed.

To-Do-List:

Highly desirable before honeymoon:

Forward berth bed installed, Bimini, Complete Electrical, Honda 5HP including fuel system.

Nice to haves:

Reacher Installed and tested

Completed so far: 

Epoxied all deck fittings including hand holds, mast raising mounts, self tacking Jib mounts, most of electrical.

bottom of page